[1]
Marena, J.T.M. and Nurfitria, N. 2026. Optimization of Sandblasting Project Scheduling at PT. Prima Saka Engineering Using the Hungarian Algorithm. Vygotsky: Jurnal Pendidikan Matematika dan Matematika. 8, 1 (Feb. 2026), 77–88. DOI:https://doi.org/10.30736/voj.v8i1.1335.