[1]
J. T. M. Marena and N. Nurfitria, “Optimization of Sandblasting Project Scheduling at PT. Prima Saka Engineering Using the Hungarian Algorithm”, VoJ, vol. 8, no. 1, pp. 77–88, Feb. 2026.